ISS Assembly

ISS Assembly

   

20.11.1998
Launch of the Zarya Control Module with a Proton rocket.

Zarya module
   

04.12. - 15.12.1998
The crew of STS-88 docks the Unity node to the ISS.

ISS after STS-88
   

27.05. - 06.06.1999
Nearly 2 tons of equipment were brought to the ISS and the Canadian built manipulator arm were mount by the crew of STS-96.

ISS after STS-96
   

19.05. - 29.05.2000
The crew of STS-101 installed the final parts of the Russian built crane.

ISS after STS-101
   

12.07.2000
The Zvezda Service Module launched atop a Russian Proton rocket and docked to the Station two weeks later.

ISS after docking of the Zvezda module
   

08.09. - 20.09.2000
STS-106 completed final connections (electrical-, data- and television cables) between Zvezda module and component Zarya.

ISS after STS-106
   

11.- 24.10.2000
The crew of STS-92 attached the docking port, called Pressurized Mating Adapter 3 (PMA-3).

ISS after STS-92

Expedition 1

Patch ISS-1
 

01.- 11.12.2000
Attaching of the P6 solar array structure by the crew of STS-97.

ISS after STS-97
 

07. - 20.02.2001
The crew of STS-98 docked the Destiny lab.

ISS after STS-98

Expedition 2

Patch ISS-2
 

08. - 21.03.2001
STS-102: PMA-3 repositioned from the berth to the port side of Unity to make room for Italian built Multi-Purpose Logistics Module "Leonardo".

ISS after STS-102
 

19.04. - 01.05.2001
Installing of the Canadian built robotic arm (57.7 foot long) called Canadarm2 by the crew of STS-100.

ISS after STS-100
 

12. - 25.07.2001
The crew of STS-104 attached Joint Airlock Module ("Quest").

ISS after STS-104

Expedition 3

Patch ISS-3
 

10. - 22.08.2001
Ammonia servicing unit and two science experiment packages attached by the STS-105 crew.

ISS after STS-105

Expedition 4

Patch ISS-4
 

05. - 17.12.2001
STS-108 brought three tons of supplies with the MPLM Raffaello cargo module.

ISS after STS-108
 

08. - 19.04.2002
Integrated Truss Structure S0 and Mobile Transporter attached by the crew of STS-110.

ISS after STS-110

Expedition 5

Patch ISS-5
 

05. - 19.06.2002
Installation of the second component of Canada's Remote Servicing System to the ISS (STS-111).

ISS after STS-111
 

07. - 18.10.2002
The crew of STS-112 attached the Star-board One (S1) Truss and the first (SO) Truss segment.

ISS after STS-112

Expedition 6

Patch ISS-6
 

24.11. - 07.12.2002
P1 solar array truss segment attached by the crew of STS-113.

ISS after STS-113

Expedition 7

Patch ISS-7
     

Expedition 8

Patch ISS-8
     

Expedition 9

Patch ISS-9
     

Expedition 10

Patch ISS-10
     

Expedition 11

Patch ISS-11
 

26.07. - 09.08.2005
Installation of the External Stowage Platform-2 Attachment Device (STS-114).

ISS after STS-114

Expedition 12

Patch ISS-12
     

Expedition 13

Patch ISS-13
 

04. - 17.07.2006
The crew of STS-121 brought supplies with the MPLM cargo module.

ISS after STS-121
 

09. - 21.09.2006
The crew of STS-115 installed the P3/P4 integrated truss and the solar arrays.

ISS after STS-115

Expedition 14

Patch ISS-14
 

10. - 22.12.2006
P5 truss segment attached (STS-116).

ISS after STS-116

Expedition 15

Patch ISS-15
 

08. - 22.06.2007
Installation of the S3/S4 truss by the crew of STS-117.

ISS after STS-117
 

08. - 21.08.2007
S5 truss attached (STS-118).

ISS after STS-118

Expedition 16

Patch ISS-16
 

23.10. - 07.11.2007
The crew of STS-120 attached the Node 2 ("Harmony").

ISS after STS-120
 

07. - 20.02.2008
European Columbus module attached by the crew of STS-122.

ISS after STS-122
 

11. - 27.03.2008
The crew of STS-123 attached the Japanese Experiment Module ("Kibo") and the Canadian built Special Purpose Dexterous Manipulator ("Dextre").

ISS after STS-123
 

03.04.2008
Arrival of the ESA built Automated Transfer Vehicle (ATV)

ISS after docking of ATV

Expedition 17

Patch ISS-17
 

31.05. - 14.06.2008
The JEM PM and the JEM RMS was attached by the crew of STS-124.

ISS after STS-124

Expedition 18

Patch ISS-18
 

15. - 30.11.2008
The crew of STS-126 brought with MPLM Leonardo supplies and equipment to the ISS.

ISS after STS-126
 

15. - 28.03.2009
ITS-S6 attached by the crew of STS-119.

ISS after STS-119

Expedition 19

Patch ISS-19
     

Expedition 20

Patch ISS-20
 

15. - 31.07.2009
The JEM EF, JEM ELM-ES was attached by the crew of STS-127.

ISS after STS-127
 

29.08. - 12.09.2009
The crew of STS-128 brought with MPLM Leonardo supplies and equipment to the ISS.

ISS after STS-128
 

17.09.2009
Arrival of the JAXA built HTV

ISS after docking of HTV

Expedition 21

Patch ISS-21
 

16. - 27.11.2009
ELC-1 ELC-2 attached by the crew of STS-129.

ISS after STS-129

Expedition 22

Patch ISS-22
 

08. - 22.02.2010
The crew of STS-130 attached the Tranquility node and the Cupola.

ISS after STS-130

Expedition 23

Patch ISS-23
 

05. - 20.04.2010
The crew of STS-131 brought with MPLM Leonardo supplies and equipment to the ISS.

ISS after STS-131
 

14. - 26.05.2010
ICC, MRM-1 (now Rassvet), ERA attached by the crew of STS-132.

ISS after STS-132

Expedition 24

Patch ISS-24
     

Expedition 25

Patch ISS-25
 

Expedition 26

Patch ISS-26
 

24.02. - 09.03.2011
ELC-4 attached by the crew of STS-133.

ISS after STS-133

Expedition 27

Patch ISS-27
 

16.05. - 01.06.2011
ELC-3 and AMS attached by the crew of STS-134.

ISS after STS-134

Expedition 28

Patch ISS-28
 

08. - 21.07.2011
The crew of STS-135 brought with MPLM Raffaello supplies and equipment to the ISS.

 

Expedition 29

Patch ISS-29
     

Expedition 30

Patch ISS-30
     

Expedition 31

Patch ISS-31
     

©        
Last update on April 27, 2012.