close window |
Total EVAs: | 6 | ||
Total EVA time: | 37h 04m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 01.09.2022 | Liu Yang | 6h 07m |
The astronauts outfitted the space station with
tools needed to support future activities. |
2 | 17.09.2022 | Cai Xuzhe | 4h 12m |
They installed the foot restraint B and an
assisting hatch handle. In addition, they installed payload a circulating pump
and demonstrated extravehicular emergency rescue. |
3 | 17.11.2022 | Cai Xuzhe | 5h 34m |
They installed a inter-module connecting device
and raised the Wentian panoramic camera A.In addition they installed handrails
on the small robotic arm. |
4 | 22.05.2025 | Chen Zhongrui | 7h 59m |
They installed the space debris protection
device that had been exited through the cargo airlock and inspection and
disposal of extravehicular equipment and facilities |
5 | 26.06.2025 | Chen Zhongrui | 6h 25m |
They completed the installation of a debris
protection device and the inspection and maintenance of external equipment, as
well as the installation of foot restraint adapters and interface adapters,
which shorten future spacewalks by approximately 40 minutes. |
6 | 15.08.2025 | Wang Jie | 6h 47m |
Installing the space station's debris shield and
extravehicular auxiliary facilities, and inspecting extravehicular equipment
and facilities. |