close window |
Total EVAs: | 5 | ||
Total EVA time: | 34h 14m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 17.09.2022 | Chen Dong | 4h 12m |
They installed the foot restraint B and an
assisting hatch handle. In addition, they installed payload a circulating pump
and demonstrated extravehicular emergency rescue. |
2 | 17.11.2022 | Chen Dong | 5h 34m |
They installed a inter-module connecting device
and raised the Wentian panoramic camera A. In addition they installed handrails
on the small robotic arm. |
3 | 17.12.2024 | Song Lingdong | 9h 06m |
Installation of the space station's space debris
protection device, the inspection and disposal of extravehicular equipment and
facilities. |
4 | 20.01.2025 | Song Lingdong | 8h 17m |
Installation of space debris protection devices
and an extravehicular inspection. |
5 | 21.03.2025 | Song Lingdong | 7h 05m |
Installation of anti-debris shields and upgraded
equipment |