close window |
| Total EVAs: | 9 | ||
| Total EVA time: | 57h 55m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 29.11.1985 | S. Spring | 5h 32m | |
| 2 | 01.12.1985 | S. Spring | 6h 41m | |
| 3 | 07.04.1991 | J. Apt | 4h 26m |
Deploying the large radio antenna of the
GRO |
| 4 | 08.04.1991 | J. Apt | 5h 47m |
Testing concepts for getting around the large
space structures using
CETA |
| 5 | 07.12.1998 | J. Newman | 7h 21m |
Installation cable from Unity to
Zarya-module |
| 6 | 09.12.1998 | J. Newman | 7h 02m |
Mounting tools, unfolding solar cell
structure |
| 7 | 12.12.1998 | J. Newman | 6h 59m |
Mounting restraints, using
SAFER |
| 8 | 13.04.2002 | L. Morin | 7h 30m |
Mounting two large tripod legs of the truss to
the Destiny Laboratory |
| 9 | 16.04.2002 | L. Morin | 6h 37m |
Installing a ladder, testing electrical switches
for upcoming truss expansion and attaching external light and equipment to be
used in future assembly work |