close window |
| Total EVAs: | 2 | ||
| Total EVA time: | ~13h 25m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 20.07.2023 | Jing Haipeng | 7h 55m |
They installed & lifted the bracket for
panoramic camera B of core module, unlocked & lifted panoramic camera A/B
of Mengtian lab module. |
| 2 | 28.08.2026 | Zhang Zhiyuan | ~5h 30m |
Solar array maintenance and installation of
debris shields |