close window |
Total EVAs: | 3 | ||
Total EVA time: | 21h 13m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 26.12.2021 | Z. Zhai | 6h 11m |
Tasks were the deployment of the external camera
platform "C" outside the core module and various object translation test
objectives. |
2 | 28.05.2024 | G. Li | 8h 23m |
Main tasks were the Installation of
micrometeorite shields and inspecting equipment outside the spacecraft with
precise coordination. |
3 | 03.07.2024 | C. Li | 6h 39m |
More micrometeorite shields on Wentian were
installed and they checked solar arrays. |