close window

Tang Hongbo

 Total EVAs:  3
 Total EVA time:  22h 08m

No. Date Together with Time Main tasks and notes
 1  04.07.2021  Liu Boming  6h 46m
Liu Boming, initially working alone, attached a foot restraint and platform to the end of the station's 10-meter robotic arm and then mounted the arm himself. Tang Hongbo, tethered to the handrails running along the exterior of the space station
 2  21.12.2023  Tang Shengjie  7h 30m
The main task was a minor solar array repair due to damages caused by micro meteoroids and debris.
 3  01.03.2024  Jiang Xinlin  7h 52m
Based on the last EVA maintenance test, this EVA focused on completing the repair work on the solar wing of the Tianhe core module