close window |
Total EVAs: | 3 | ||
Total EVA time: | 22h 08m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 04.07.2021 | Liu Boming | 6h 46m |
Liu Boming, initially working alone, attached a
foot restraint and platform to the end of the station's 10-meter robotic arm
and then mounted the arm himself. Tang Hongbo, tethered to the handrails
running along the exterior of the space station |
2 | 21.12.2023 | Tang Shengjie | 7h 30m |
The main task was a minor solar array repair due
to damages caused by micro meteoroids and debris. |
3 | 01.03.2024 | Jiang Xinlin | 7h 52m |