close window |
| Total EVAs: | 3 | ||
| Total EVA time: | 24h 28m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 17.12.2024 | Cai Xuzhe | 9h 06m |
Installation of the space station's space debris
protection device, the inspection and disposal of extravehicular equipment and
facilities. |
| 2 | 20.01.2025 | Cai Xuzhe | 8h 17m |
Installation of space debris protection devices
and an extravehicular inspection. |
| 3 | 21.03.2025 | Cai Xuzhe | 7h 05m |
Installation of anti-debris shields and upgraded
equipment |