close window

Li Guangsu

 Total EVAs:  1
 Total EVA time:  8h 23m

No. Date Together with Time Main tasks and notes
 1  28.05.2024  G. Ye  8h 23m
Main tasks were the Installation of micrometeorite shields and inspecting equipment outside the spacecraft with precise coordination.