close window

Cai Xuzhe

 Total EVAs:  2
 Total EVA time:  9h 46m

No. Date Together with Time Main tasks and notes
 1  17.09.2022  Chen Dong  4h 12m
They installed the foot restraint B and an assisting hatch handle. In addition, they installed payload a circulating pump and demonstrated extravehicular emergency rescue.
 2  17.11.2022  Chen Dong  5h 34m
They installed a inter-module connecting device and raised the Wentian panoramic camera A. In addition they installed handrails on the small robotic arm.