Philippe Perrin

 Total EVAs:  3
 Total EVA time:  19h 31m

No. Date Together with Time Main tasks and notes
 1  09.06.2002  F. Chang-Diaz  7h 14m
Installing a Power and Data Grapple Fixture to the station's P6 truss, to gather six micrometeorid debris shields from the shuttle cargo bay and to store them temporarily on the PMA-1; Chang-Diaz conducted a visual and photographic inspection of the failed gyroscope
 2  11.06.2002  F. Chang-Diaz  5h 00m
Completing the installation of the second component of Canada's Remote Servicing System to the ISS; they connected power and data cables to the newly installed Mobile Base System (MBS) and bolt it to the Mobile Transporter; they also relocated a TV camera
 3  13.06.2002  F. Chang-Diaz  7h 17m
Replacing a faulty wrist-roll joint on Canadarm2

close window