Soichi Noguchi

 Total EVAs:  4
 Total EVA time:  27h 01m

No. Date Together with Time Main tasks and notes
 1  30.07.2005  S. Robinson  6h 50m
Testing thermal protection system repair techniques and installation of the External Stowage Platform-2 Attachment Device (ESPAD) on the space station
 2  01.08.2005  S. Robinson  7h 14m
Replace of a failed International Space Station attitude control gyroscope
 3  03.08.2005  S. Robinson  6h 01m
Attach of a massive external tool box to the space station's Quest airlock module; mounting an experiment package on the top of the station's solar array truss; and remove two "gap fillers" sticking up between heat shield tiles on Discovery's belly
 4  05.03.2021  K. Rubins  6h 56m
They completing the modification kits for the IROSA solar arrays to be delivered to ISS later this year.