close window |
Total EVAs: | 1 | ||
Total EVA time: | 6h 13m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 07.10.2014 | R. Wiseman | 6h 13m |
The astronauts moved a failed cooling pump from
temporary to long-term storage on the station's truss. They also installed a
new relay system that will provide backup power options to the mobile
transporter, which moves the large robotic arm around the out outside of the
space station. |