Arne Christer Fuglesang

 Total EVAs:  5
 Total EVA time:  31h 54m

No. Date Together with Time Main tasks and notes
 1  12.12.2006  R. Curbeam  6h 36m
Align and connect the P5 truss segment to P4
 2  14.12.2006  R. Curbeam  5h 00m
Reconfigure power on channels 2 and 3 of the station's electrical system
 3  18.12.2006  R. Curbeam  6h 38m
Fully retract the array
 4  03.09.2009  D. Olivas  6h 39m
Removing the new ammonia tank from the shuttle's payload bay and replacing it with the used tank on the station.
 5  05.09.2009  D. Olivas  7h 01m
Preparing for the arrival of the Tranquility node by attaching cables between the starboard truss and the Unity node. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas and a new circuit breaker.