Total EVAs: | 5 | ||
Total EVA time: | 31h 54m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 12.12.2006 | R. Curbeam | 6h 36m |
Align and connect the P5 truss segment to
P4 |
2 | 14.12.2006 | R. Curbeam | 5h 00m |
Reconfigure power on channels 2 and 3 of the
station's electrical system |
3 | 18.12.2006 | R. Curbeam | 6h 38m |
Fully retract the array |
4 | 03.09.2009 | D. Olivas | 6h 39m |
Removing the new ammonia tank from the shuttle's
payload bay and replacing it with the used tank on the station. |
5 | 05.09.2009 | D. Olivas | 7h 01m |
Preparing for the arrival of the Tranquility
node by attaching cables between the starboard truss and the Unity node. The
spacewalkers also replaced a communications sensor device, installed two new
GPS antennas and a new circuit breaker. |