| Total EVAs: | 3 | ||
| Total EVA time: | 19h 53m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 25.06.1993 | G. Low | 5h 50m | |
| 2 | 16.10.2000 | M. Lopez-Alegria | 7h 07m |
Pressurized Mating Adapter 3 was grappled by the
shuttle's robotic arm and installed on the Unity Connecting Module nadir port.
The primary and secondary cable bundles were connected between the Pressurized
Mating Adapter 3 and the Unity Module. Also, latches were opened on the Z1
Truss |
| 3 | 18.10.2000 | M. Lopez-Alegria | 6h 56m |
A grapple fixture on the Z1 Truss was removed.
The Z1 utility tray was deployed and its umbilical launch restraints released.
The Z1 Manual Berthing Mechanism latches was cycled and opened. Wisoff and
Lopez-Alegria performed one safety protocol test -- a flight evaluation of
SAFER, which means "simplified aid for
EVA
rescue". |