| Total EVAs: | 2 | ||
| Total EVA time: | 12h 47m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 07.10.2014 | A. Gerst | 6h 13m |
The astronauts moved a failed cooling pump from
temporary to long-term storage on the station's truss. They also installed a
new relay system that will provide backup power options to the mobile
transporter, which moves the large robotic arm around the out outside of the
space station. |
| 2 | 15.10.2014 | B. Wilmore | 6h 34m |
The two-man team replaced a sequential shunt
unit electronics box, a voltage regulator, on the starboard truss that failed
in mid-May. Although the station has since operated normally on seven of its
eight power channels, the voltage regulator replacement is considered a high
priority. |