Barry Eugene "Butch" Wilmore

 Total EVAs:  4
 Total EVA time:  25h 36m

No. Date Together with Time Main tasks and notes
 1  15.10.2014  R. Wiseman  6h 34m
The two-man team replaced a sequential shunt unit electronics box, a voltage regulator, on the starboard truss that failed in mid-May. Although the station has since operated normally on seven of its eight power channels, the voltage regulator replacement is considered a high priority.
 2  21.02.2015  T. Virts  6h 41m
The astronauts started routing cables for the International Docking Adapter (IDA). In preparation for the arrival of new commercial crew vehicles to the ISS in late 2017 - which will use a brand new docking system - the existing docking ports on the ISS need to be converted to the new standard, before any commercial crew vehicles can dock to the outpost.
 3  25.02.2015  T. Virts  6h 43m
The astronauts unfurled and hooked up two more long cables and Terry Virts lubricated the grapple fixture on the end of the space station's robot arm (SSRMS).
 4  01.03.2015  T. Virts  5h 38m
They installed new antennas and cabling needed for communications between the station and commercial crew capsules bound for, or departing from, the new docking adapters.

close window