| Total EVAs: | 6 | ||
| Total EVA time: | 43h 30m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 26.10.2007 | S. Parazynski | 6h 14m |
Retrieve and stow S-band Antenna Support
Assembly, detach Node 2 ("Harmony") heater cables and remove cover from Node 2
aft berthing mechanism, stow grapple fixture on Node 2, disconnect Z1/P6 truss
fluid lines, install shrouds on P6 radiator and Sequential Shunt Unit, move and
attach Node 2 to Node 1 left-hand docking port with Station robotic arm,
pressurise area between Node 1 and Node 2 hatches, perform leak check, open
Node 1 hatch |
| 2 | 30.10.2007 | S. Parazynski | 7h 08m |
During this
EVA
the astronauts bolt P6 truss to P5 truss, attached P5 to P6 cabling, removed P6
radiator restraint and cover on Sequential Shunt unit and deploy radiator,
configured squib firing unit on P1 truss, relocated main Bus Switching Unit
from the Shuttle Cargo Bay to External Stowage Platform 2. |
| 3 | 03.11.2007 | S. Parazynski | 7h 19m |
Attaching cufflink-like clips across the 15-foot
width of the torn P6-4B solar array blanket to provide the strength needed to
permit its full extension. This dramatic repair job was carried out successful.
|
| 4 | 07.08.2010 | T. Caldwell-Dyson | 8h 03m |
They removed hose clamps and then started
disconnecting umbilicals from the broken space station coolant pump. However,
difficulty unplugging one of the ammonia lines consumed a couple of hours and a
leak seen from that connector once it finally cooperated prevented the
astronauts from progressing any further in their work. |
| 5 | 11.08.2010 | T. Caldwell-Dyson | 7h 26m |
Removing the old pump and stowing it on a
payload attachment bracket on the Mobile Base System on the station's truss
while preparing the replacement pump for its removal from a stowage platform
adjacent to the Quest airlock and its installation on the truss during a third
spacewalk. |
| 6 | 16.08.2010 | T. Caldwell-Dyson | 7h 20m |
Installation of a spare ammonia pump module on
the S1 Truss. |