Terry Wayne Virts, Jr.

 Total EVAs:  3
 Total EVA time:  19h 02m

No. Date Together with Time Main tasks and notes
 1  21.02.2015  B. Wilmore  6h 41m
The astronauts started routing cables for the International Docking Adapter (IDA). In preparation for the arrival of new commercial crew vehicles to the ISS in late 2017 - which will use a brand new docking system - the existing docking ports on the ISS need to be converted to the new standard, before any commercial crew vehicles can dock to the outpost.
 2  25.02.2015  B. Wilmore  6h 43m
The astronauts unfurled and hooked up two more long cables and Terry Virts lubricated the grapple fixture on the end of the space station's robot arm (SSRMS).
 3  01.03.2015  B. Wilmore  5h 38m
They installed new antennas and cabling needed for communications between the station and commercial crew capsules bound for, or departing from, the new docking adapters.