| Total EVAs: | 7 | ||
| Total EVA time: | 46h 29m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 15.02.1997 | G. Harbaugh | 7h 27m |
HST-SM-02, mounting tools |
| 2 | 17.02.1997 | G. Harbaugh | 6h 34m |
HST-SM-02, mounting tools |
| 3 | 04.12.2000 | C. Noriega | 7h 33m |
Mounting P 6 solar array structure |
| 4 | 05.12.2000 | C. Noriega | 6h 37m |
Mounting P 6 solar array structure |
| 5 | 07.12.2000 | C. Noriega | 5h 10m |
Mounting P 6 solar array structure |
| 6 | 12.09.2006 | H. Stefanyshyn-Piper | 6h 26m |
Installation of power and data cables between
the P1 and P3/P4 structures in preparation for solar array
deployment |
| 7 | 15.09.2006 | H. Stefanyshyn-Piper | 6h 42m |
Performing final tasks required for activation
of the Solar Alpha Rotary Joint (SARJ); the
SARJ is an automobile-sized joint that will allow the
station's solar arrays to turn and point toward the sun; they also prepared the
P3/P4 truss and its solar arrays for operation by setting the stage for
deployment of the truss' radiator |