close window |
Total EVAs: | 3 | ||
Total EVA time: | 21h 12m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 14.03.2008 | R. Linnehan | 7h 01m |
Preparing the
JEM ELM PS for its removal from the shuttle's payload
bay. |
2 | 17.05.2010 | S. Bowen | 7h 25m |
Installing a spare space-to-ground Ku-band
antenna on the station's truss. Then they installed a new tool platform on
Dextre. The spacewalkers breaked the torque on bolts
holding batteries in place on the truss. |
3 | 21.05.2010 | M. Good | 6h 46m |
Installing the final two new batteries on the
truss and put the old batteries on the carrier. Next, they retrieved a grapple
fixture from Atlantis' payload bay and brought it inside the station for use as
a spare. |