close window |
Total EVAs: | 3 | ||
Total EVA time: | 18h 14m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 12.02.2010 | R. Behnken | 6h 32m |
The spacewalkers removed and stored a spare
parts platform from the Special Purpose Dexterous Manipulator, or
Dextre. Finally, they installed four electronics
systems cables between Unity and Tranquility to bring the new node to life.
|
2 | 14.02.1010 | R. Behnken | 5h 54m |
Installing ammonia plumbing connectors between
Unity and Tranquility and covered them with thermal insulation. |
3 | 17.02.2010 | R. Behnken | 5h 48m |
Turning on the ammonia cooling lines between
Unity and Tranquility, installing heater and data cables on Tranquility,
removing insulation and launching locks from the newly installed Cupola, and
installed handrails on the outside of Tranquility. |