| Total EVAs: | 3 | ||
| Total EVA time: | 18h 14m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 12.02.2010 | R. Behnken | 6h 32m |
Removing a cover that has been in place to
protect a port on the Unity node, the location where Tranquility was attached
robotically halfway through the spacewalk. Next, the spacewalkers removed and
stored a spare parts platform from the Special Purpose Dexterous Manipulator,
or
Dextre, a two-armed space station robot capable of
handling delicate assembly tasks currently performed by spacewalkers. Finally,
they installed four electronics systems cables between Unity and Tranquility to
bring the new node to life. |
| 2 | 14.02.1010 | R. Behnken | 5h 54m |
Installing ammonia plumbing connectors between
Unity and Tranquility and covered them with thermal insulation. When turned on,
the ammonia will provide cooling to Tranquility. Then they prepared a port on
the Earth-facing side of Tranquility for the flight day 8 relocation and
attachment of the Cupola. |
| 3 | 17.02.2010 | R. Behnken | 5h 48m |
Turning on the ammonia cooling lines between
Unity and Tranquility, installing heater and data cables on Tranquility,
removing insulation and launching locks from the newly installed Cupola, and
installed handrails on the outside of Tranquility. |