close window

Franklin Story Musgrave

 Total EVAs:  4
 Total EVA time:  26h 12m

No. Date Together with Time Main tasks and notes
 1  07.04.1983  D. Peterson  4h 10m
Testing space suit and tools
 2  05.12.1993  J. Hoffman  7h 54m
HST-SM-1, replace of Rate Sensor Units
 3  07.12.1993  J. Hoffman  6h 47m
HST-SM-1, replace of Wide Field / Planetary Camera
 4  09.12.1993  J. Hoffman  7h 21m
HST-SM-1, replace of SADE controller