| Total EVAs: | 3 | ||
| Total EVA time: | 21h 44m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 18.10.2019 | C. Koch | 7h 17m |
The
EVA
was needed to replace a faulty battery charge/discharge unit (BCDU). The BCDU
failed to activate following the October 11, 2019 installation of new
lithium-ion batteries on the space station's truss. |
| 2 | 15.01.2020 | C. Koch | 7h 29m |
The astronauts continued to replace
nickel-hydrogen batteries with more powerful lithium-ion batteries (working
site: P6 Channel 4B battery R&R A-F). |
| 3 | 20.01.2020 | C. Koch | 6h 58m |
Their task was again to replace nickel-hydrogen
batteries with more powerful lithium-ion batteries on the far end of the
station's port truss (working site: P6 Channel 4B battery R&R
A-F). |