| Total EVAs: | 4 | ||
| Total EVA time: | 24h 21m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 15.10.2000 | L. Chiao | 6h 28m |
The S-band Antenna Support Assembly was
relocated on the Z1 Truss. The Z1 starboard bulkhead thermal shrouds were
removed and stowed. The port Extravehicular Tool Storage Devices were released
and transferred from the Spacelab Logistics Pallet to the Z1 Truss. The
Z1-to-Node 1 umbilicals, or cables, were connected. The Space-to-Ground Antenna
dish was installed onto the boom and the boom was deployed |
| 2 | 17.10.2000 | L. Chiao | 6h 48m |
Two DC-to-DC Converter Unit-Heat Pipes were
installed on Z1. The Z1 keel pin assembly was then relocated to another
location on Z1. The Z1/P6 launch locks were removed, then the Assembly Power
Converter Units jumpers were also removed from the Pressurized Mating Adapter 2
to allow for installation of four Z1 cables. The starboard Extravehicular Tool
Storage Device was released and transferred from the Spacelab Logistics Pallet
to the Z1 Truss. |
| 3 | 07.11.2005 | V. Tokarev | 5h 22m |
Installing a camera on the port side of the
station's horizontal truss structure and removing an old experiment from the
solar array truss on top of the facility |
| 4 | 03.02.2006 | V. Tokarev | 5h 43m |
Installing a safing bolt to prevent the
inadvertent firing of an electro mechanical cable cutter on a mobile
transporter used to move the station's big robot arm to different work sites;
deployed SuitSat, an old Russian spacesuit with an amateur radio
transmitter |