Timothy Lennart Kopra

 Total EVAs:  3
 Total EVA time:  13h 31m

No. Date Together with Time Main tasks and notes
 1  18.07.2009  D. Wolf  5h 32m
Prepare connecting mechanisms for Kibo and the exposed facility.
 2  21.12.2015  S. Kelly  3h 16m
The pair moved the station's mobile transporter rail car so it can be latched in place ahead of the docking of a Russian cargo resupply spacecraft on December 23, 2015.
 3  15.01.2016  T. Peake  4h 43m
They replaced a failed voltage regulator that compromised one of the station's eight power channels. Additional tasks included deploying cables for the future installation of an IDA.

close window