Timothy Lennart Kopra

 Total EVAs:  3
 Total EVA time:  13h 31m

No. Date Together with Time Main tasks and notes
 1  18.07.2009  D. Wolf  5h 32m
Prepare connecting mechanisms for Kibo and the exposed facility. They also released bolts on an ammonia tank assembly as get-ahead work for the next shuttle mission, STS-128. Then, both worked to deploy the unpressurized cargo carrier attachment system (UCCAS) on the Port 3 truss.
 2  21.12.2015  S. Kelly  3h 16m
The pair moved the station's mobile transporter rail car so it can be latched in place ahead of the docking of a Russian cargo resupply spacecraft on December 23, 2015.
 3  15.01.2016  T. Peake  4h 43m
The astronauts replaced a failed voltage regulator that compromised one of the station's eight power channels on November 13, 2015. Additional tasks included deploying cables for the future installation of an International Docking Adapter (IDA) , and retrieving a broken light from a truss camera.

close window