| Total EVAs: | 3 | ||
| Total EVA time: | 18h 20m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 28.10.2015 | K. Lindgren | 7h 16m |
The
EVA
focused on station upgrades and maintenance tasks, including installing a
thermal cover on the Alpha Magnetic Spectrometer, which is a state-of-the-art
particle physics detector that has been attached to the station since 2011.
|
| 2 | 06.11.2015 | K. Lindgren | 7h 48m |
The astronauts attempted to restore the port
truss ammonia cooling system to its original configuration. A spacewalk
conducted in November 2012 tried to isolate a leak in the truss' cooling
supply, but the leak was subsequently traced to a different
component. |
| 3 | 21.12.2015 | T. Kopra | 3h 16m |
The pair moved the station's mobile transporter
rail car so it can be latched in place ahead of the docking of a Russian cargo
resupply spacecraft on December 23, 2015. |