close window |
Total EVAs: | 5 | ||
Total EVA time: | 32h 01m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 21.12.2013 | R. Mastracchio | 5h 28m |
The
EVA
mainly focused on disconnecting the failed loop A pump module from its location
on the Starboard 1 (S1) Truss - including the infamously difficult ammonia
disconnections. |
2 | 25.12.2013 | R. Mastracchio | 7h 30m |
They removed a spare pump module from the
ESP-3 and installed it on the Starboard 1 (S1)
Truss. |
3 | 27.01.2021 | V. Glover | 6h 56m |
This spacewalk focused on completing cable and
antenna rigging for the "Bartolomeo" science payloads platform outside the
ESA
Columbus module. The duo also configured a Ka-band terminal, known as COL-Ka.
|
4 | 01.02.2021 | V. Glover | 5h 20m |
Main tasks were the installation of a final
lithium-ion battery adapter plate on the port 4 (P4) truss that wrapped up
battery replacement work begun in January 2017. |
5 | 13.03.2021 | V. Glover | 6h 47m |
They vent and relocated ammonia jumper cables,
installed a structural "stiffener" on the airlock thermal cover, and completed
the connection of payload cables on the new Bartolomeo platform on the Columbus
module. |