| Total EVAs: | 3 | ||
| Total EVA time: | 19h 55m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 26.11.2002 | M. Lopez-Alegria | 6h 45m |
Hooking up connections between the P1 and S0
trusses and do other work and installations |
| 2 | 28.11.2002 | M. Lopez-Alegria | 6h 10m |
Installation of the fluid jumpers where the S0
and the P1 are attached to each other, removal of the P1's starboard keel pin
and relocation of the
CETA
cart from the P1 to the S1 Truss, which will allow the Mobile Transporter to
move along the P1 to assist in upcoming assembly mission. |
| 3 | 30.11.2002 | M. Lopez-Alegria | 7h 00m |
Installation of more
SPD's (Spool
Positioning Devices), reconfiguration of electrical har-nesses that route power
through the Main Bus Switching Units and attaching Ammonia Tank Assembly
lines. |