close window |
Total EVAs: | 3 | ||
Total EVA time: | 19h 56m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 22.03.2019 | A. McClain | 6h 39m |
They installed the adapter plates for the new
batteries and to replace nickel-hydrogen batteries with newer, more powerful
lithium-ion batteries for the power channel on one pair of the station's solar
arrays. |
2 | 29.03.2019 | C. Koch | 6h 45m |
The two astronauts successfully connected three
newer, more powerful lithium-ion batteries to replace the previous six
nickel-hydrogen batteries that provide power for one channel on one pair of the
station's solar arrays. |
3 | 21.08.2019 | A. Morgan | 6h 32m |
The duo assisted in the installation of
International Docking Adapter-3 (IDA-3) to Pressurized Mating Adapter-3 on the
space-facing side of the station's Harmony module. |