close window |
Total EVAs: | 4 | ||
Total EVA time: | 27h 03m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 03.06.2008 | M. Fossum | 6h 48m |
Transfer of the Orbiter Boom Sensor System back
to the shuttle from its temporary location of the station's truss, or backbone.
The crew then prepared the
JEM PM for its removal from the shuttle's payload bay.
|
2 | 05.06.2008 | M. Fossum | 7h 11m | |
3 | 08.06.2008 | M. Fossum | 6h 33m |
Replacing a failed nitrogen tank assembly on the
station's truss with a spare that was temporarily stored on one of the station
external stowage platforms. They also retrieved a failed camera system on the
truss. |
4 | 12.07.2011 | M. Fossum | 6h 31m |
Transfer of a failed ammonia pump to the shuttle
cargo bay, transfer of the Robotic Refueling Mission (RRM) to the station and
place an experiment on
ELC-2 for long duration exposure. |