| Total EVAs: | 7 | ||
| Total EVA time: | 48h 32m |
| No. | Date | Together with | Time | Main tasks and notes |
| 1 | 08.07.2006 | P. Sellers | 7h 31m |
Maintenance on the stations mobile
transporter and a test of astronaut movement on the end of the robotic arm boom
extension for possible heat shield repairs during future flights |
| 2 | 10.07.2006 | P. Sellers | 6h 47m |
Installation of a spare thermal control system
pump on to the outside of the Quest Airlock; replacement of reel assembly for a
cable that provides power and data to the stations mobile
transporter |
| 3 | 12.07.2006 | P. Sellers | 7h 11m |
Demonstration of on-orbit heat shield repair
techniques |
| 4 | 03.06.2008 | R. Garan | 6h 48m | |
| 5 | 05.06.2008 | R. Garan | 7h 11m | |
| 6 | 08.06.2008 | R. Garan | 6h 33m |
Replacing a failed nitrogen tank assembly on the
station's truss with a spare that was temporarily stored on one of the station
external stowage platforms. They also retrieved a failed camera system on the
truss. |
| 7 | 12.07.2011 | R. Garan | 6h 31m |
Transfer of a failed ammonia pump to the shuttle
cargo bay, transfer of the Robotic Refueling Mission (RRM) to the station and
place an experiment on
ELC-2 for long duration exposure. |