close window |
Total EVAs: | 2 | ||
Total EVA time: | 12h 48m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 28.02.2011 | S. Bowen | 6h 34m |
They installed a power extension cable between
the Unity and Tranquility nodes to provide a contingency power source. The
spacewalkers moved the failed ammonia pump module from an attachment bracket to
a stowage platform adjacent to the Quest airlock. They next replaced a guide
for the rail cart system used for moving cargo along the truss. |
2 | 02.03.2011 | S. Bowen | 6h 14m |
The astronauts removed thermal insulation from a
platform. Bowen then installed a camera assembly on the
Dextre robot. |