close window |
Total EVAs: | 6 | ||
Total EVA time: | 36h 19m |
No. | Date | Together with | Time | Main tasks and notes |
1 | 15.01.1996 | D. Barry | 6h 09m | |
2 | 17.01.1996 | W. Scott | 6h 54m | |
3 | 15.10.2000 | W. McArthur | 6h 28m |
The S-band Antenna Support Assembly was
relocated on the Z1 Truss. The port Extravehicular Tool Storage Devices were
released and transferred from the Spacelab Logistics Pallet to the Z1 Truss.
The Space-to-Ground Antenna dish was installed onto the boom and the boom was
deployed. |
4 | 17.10.2000 | W. McArthur | 6h 48m |
Two DC-to-DC Converter Unit-Heat Pipes were
installed on Z1. The Z1 keel pin assembly was then relocated to another
location on Z1. The starboard Extravehicular Tool Storage Device was released
and transferred from the Spacelab Logistics Pallet to the Z1 Truss. |
5 | 26.01.2005 | S. Sharipov | 5h 30m |
Installing a work platform on the hull of the
command module, to mount the European commercial experiment Rokviss, to
relocate the Japanese space exposure experiment package and to install a
Russian biological experiment |
6 | 28.03.2005 | S. Sharipov | 4h 30m |