Human Spaceflights

International Flight No. 216

STS-92

Discovery (28)

USA

Patch STS-92 Patch STS-92 ISS-3A

hi res version (359 KB)

hi res version (505 KB)

Patch STS-92 ISS-3A ITS Z 1

Launch, orbit and landing data

Launch date:  11.10.2000
Launch time:   23:17 UTC
Launch site:  Cape Canaveral (KSC)
Launch pad:  39-A
Altitude:  328 km
Inclination:  51,6°
Docking ISS:  13.10.2000, 17:45:10 UTC
Undocking ISS:  20.10.2000, 15:08:39 UTC
Landing date:  24.10.2000
Landing time:  20:59 UTC
Landing site:  Edwards AFB

walkout photo

Crew STS-92

hi res version (965 KB)

alternate crew photo

alternate crew photo

alternate crew photo

Crew

No.   Surname Given names Position Flight No. Duration Orbits
1 USA  Duffy  Brian  CDR 4 12d 21h 43m  203 
2 USA  Melroy  Pamela Ann  PLT 1 12d 21h 43m  203 
3 USA  Chiao  Leroy  MSP 3 12d 21h 43m  203 
4 USA  McArthur  William Surles, Jr. "Bill"  MSP 3 12d 21h 43m  203 
5 USA  Wisoff  Peter Jeffrey Kelsay "Jeff"  MSP 4 12d 21h 43m  203 
6 USA  Lopez-Alegria  Michael Eladio "LA"  MSP 2 12d 21h 43m  203 
7 Japan  Wakata  Koichi  MSP 2 12d 21h 43m  203 

Crew seating arrangement

Launch
1  Duffy
2  Melroy
3  Wakata
4  McArthur
5  Wisoff
6  Lopez-Alegria
7  Chiao
Space Shuttle cockpit
Landing
1  Duffy
2  Melroy
3  Lopez-Alegria
4  McArthur
5  Wisoff
6  Wakata
7  Chiao

Flight

Launch from Cape Canaveral (KSC); landing on Edwards AFB. Fifth Space Station Assembly Mission ISS-05-3A.

Following a two day solo flight the Discovery docked with ISS on 13.10.2000 and transfer of equipment and supplies into the ISS. On flight day 3 the Z1 Truss was installed. ITS Z1 is an early exterior framework to allow the first U.S. solar arrays on flight 4A to be temporarily installed on Unity for early power.

First EVA by McArthur and Chiao on 15.10.2000 (6h 28m). The S-band Antenna Support Assembly was relocated on the Z1 Truss. The Z1 starboard bulkhead thermal shrouds were removed and stowed. The port Extravehicular Tool Storage Devices were released and transferred from the Spacelab Logistics Pallet to the Z1 Truss. The Z1-to-Node 1 umbilicals, or cables, were connected. The Space-to-Ground Antenna dish was installed onto the boom and the boom was deployed.

Second EVA by Wisoff and Lopez-Alegria on 16.10.2000 (7h 07m). The Pressurized Mating Adapter 3 was grappled by the shuttle's robotic arm and installed on the Unity Connecting Module nadir port. The primary and secondary cable bundles were connected between the Pressurized Mating Adapter 3 (PMA-3) and the Unity Module. Also, latches were opened on the Z1 Truss

Third EVA by McArthur and Chiao on 17.10.2000 (6h 48m). Two DC-to-DC Converter Unit-Heat Pipes were installed on Z1. The Z1 keel pin assembly was then relocated to another location on Z1. The Z1/P6 launch locks were removed, then the Assembly Power Converter Units jumpers were also removed from the Pressurized Mating Adapter 2 to allow for installation of four Z1 cables. The starboard Extravehicular Tool Storage Device was released and transferred from the Spacelab Logistics Pallet to the Z1 Truss.

Fourth and final EVA by Wisoff and Lopez-Alegria on 18.10.2000 (6h 56m). A grapple fixture on the Z1 Truss was removed. The Z1 utility tray was deployed and its umbilical launch restraints released. The Z1 Manual Berthing Mechanism latches was cycled and opened. Wisoff and Lopez-Alegria performed one safety protocol test -- a flight evaluation of SAFER, which means "simplified aid for EVA rescue".

Due to bad weather at both landing areas the Discovery had two additional days in space and was diverted to the Edwards AFB.

Photos / Drawings

Space Shuttle PMA-3
SAFER crew in training
STS-92 rollout STS-92 launch
EVA Lopez-Alegria traditional in-flight photo STS-92
STS-92 landing post landing activities
Return to KSC  

©      

Last update on October 27, 2010.

Back to homepage SPACEFACTS